Installation of Concrete Steps
Water Corporation required a contractor to construct a set of concrete steps with handrails and associated pathways for the Caddadup waste water treatment plant. Quality Assured developed a specification and drawings based on client standards, and installation progressed seamlessly as per schedule.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed