Paris

Pump and Pipework Upgrades

Client:Water Corporation of WA
Location:Forrest Street Melville Waste Water Pumping Station
Service:Repair and Maintenance

Quality Assured was contracted to install new pumps to the Forrest Street Melville Waste Water Pumping Station (WWPS). The project involved removing the existing pumps and replacing them with Flygt NT3202 Waste Water Pumps.

Work was also required to replace the pump outlet piping which included  mild steel concrete lined ( MSCL ) pipe.

Start typing and press Enter to search