Quality Assured was contracted to install new pumps to the Adrian Street Palmyra Waste Water Pumping Station (WWPS). The project involved removing the existing pumps and replacing them with Flygt NT3301 vertically mounted pumps along with work to replace the inlet and outlet valves, mild steel concrete lined (MSCL) pipe spools, 90 degree ‘ducks foot’ discharge … Continue reading Pump Upgrade